![]() Four miles of temporary fencing will be installed. ![]() 45,000 cubic yards of concrete will be recycled as part of the future airfield paving.3.4 million square feet (77 acres) of existing paving/landscaping will be demolished.Temporary roadways more than one mile long will be constructed.12 miles of new utilities (storm water, sewer, water, electrical) will be installed (This is the equivalent of a continuous utility line from downtown Salt Lake City to Rio Tinto Stadium in Sandy.).12 miles of existing utilities will be removed.Here are some facts about the demolition and rerouting of Terminal Drive, taking place in summer of 2016: The exit ramp area - as well as what formerly housed the car rental canopies - will become a new roadway exiting the airport the summer of 2016 to prepare for future construction projects. The drive-through lane was closed in October and converted to Premium Parking. The exit ramp to what was previously the drive-through lane of the Airport's short-term parking garage has been demolished.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |